Description
DeVry NETW 310 Week 4 iLab Latest
iLab 4: Outside Plant Installation (70 points)
Note!
Submit your assignment to the Dropbox, located at the top of this page.
(See the Syllabus section “Due Dates for Assignments & Exams” for due dates.)
ILAB OVERVIEW
Scenario/Summary
For this week’s lab, you be looking at “Right of Way” issues that deal with outside plant installations in a “real” scenario.
You will be using the Right of Way manual developed by the city of Burleson, Texas to determine what requirements the local jurisdiction has in the case of a new installation of media and what rules you will need to follow to complete the installation project. In this example, a city street must be crossed to interconnect two buildings to each other. Therefore, the local jurisdiction does cover Right of Way issues.
Here is the scenario.
You are the network manager for the local school district. Due to growth in the city, one of the elementary schools has run out of classroom space. Across a city street from this elementary school, there is a church that is for sale. The school district is considering purchasing this church as a low-cost way to expand the space in the elementary school. The local-area networks in the two buildings will have to be connected to each other.Due to the school district’s data-security policy, the connection must be made using wired media. To install this media, the city street between the two buildings must be crossed. This crossing will be underground. Here is the relationship of the two buildings.
etwork manager, you will have done a feasibility study and are now at the point of looking at vendors, timelines, and project specifics. You will first issue a request for proposal (RFP) to hire a firm to perform this work for the school district. To create this RFP, you must determine what the city’s requirements are for this type of work.After reading the .equella.ecollege.com/file/eca204c4-04cd-45e6-8940-5afb2a2733ae/18/rowmanual.pdf”>Right of Way Manual also found in Doc Sharing and the background information from the iLab content item this week, answer the questions in the lab report on the iLab page.
Vendors will respond to the RFP and you will rank their answers based on a criteria you decide is best for the project.
Deliverables
You are required to submit a lab report to the Week 4 Dropbox.
Required Software
None
ILAB STEPS
STEP 1: Download the Lab Report Template
.equella.ecollege.com/file/eca204c4-04cd-45e6-8940-5afb2a2733ae/18/NETW310_W4_iLab.html#top”>Back to Top
Download this week’s Lab Report Template form Doc Sharing.
STEP 2: Answer the Questions
.equella.ecollege.com/file/eca204c4-04cd-45e6-8940-5afb2a2733ae/18/NETW310_W4_iLab.html#top”>Back to Top
Answer the questions concerning installation in the outside plant installation.
STEP 3: Submit the Work
.equella.ecollege.com/file/eca204c4-04cd-45e6-8940-5afb2a2733ae/18/NETW310_W4_iLab.html#top”>Back to Top
Submit your completed report to the Week 4 Dropbox.
Submit your lab to the Dropbox, located at the top of this page. For instructions on how to use the Dropbox, read these .next.ecollege.com/default/launch.ed?ssoType=DVUHubSSO2&node=184″>step-by-step instructions or watch this Tutorial.next.ecollege.com/default/launch.ed?ssoType=DVUHubSSO2&node=232″>Dropbox Tutorial.
See the Syllabus section “Due Dates for Assignments & Exams” for due date information.
NETW310 Week 4 Lab Report
To complete your Week 4 lab report, answer the questions below concerning the installation of the outside plant equipment.
Create your report using the template starting on page 2 and submit it to the Week 4 Dropbox by the due date.
Create your report using the template starting on page 2 and submit it to the Week 4 Dropbox by the due date.Use the reference documents and websites as required to complete the iLab questions.
In order to be eligible to receive full credit, you must write in complete sentences and use the lab report template. Answers that are NOT written in complete sentences will receive point deductions.
Use a red-coloredfont for you answers.
Using the template and completing the header are worth 2 points on your grade for this assignment.
REMOVE THIS PAGE BEFORE YOU TURN IN YOUR DELIVERABLE AS IT IS INSTRUCTIONS ONLY.
Your Name
NETW310, Professor’s Name
Current Date
Lab #4, Installation in the Outside Plant
Lab Report
This assignment has 19 questions that are weighted as marked on the iLab sheet. Each answer is worth 2, 3, 4 or 5 points. Using the template and completing the header are worth 2 points on your grade for this assignment.
Use a red-coloredfont for you answers. Answers that are NOT written in complete sentences will receive point deductions. You are to add in any references you do use. Please Support all of your decisions.
In order to be eligible to receive full credit, you must write in complete sentences and use the lab report template. You are to take off the cover of the template since this is a page of instructions, but include your header.
Place your answers in the template below the questions.
Section I: Use a reference such as the IRWA (.irwaonline.org/”>www.irwaonline.org) to answer the question below. Cite your reference. (citation is worth 2 points)
- 1.What is a right-of-way? (4 points)
Section II: Using the RIGHT OF WAY Manual for the city of Burleson,Texas available in doc sharing and from the Week 4 iLab page, answer the questions below. (Each question is worth 3 points, section of the manual is worth 2 points)
- 1.May we dig a trench across the city street shown in this lab? (3 points) What section/sections in the ROW manual for the city of Burleson, Texas are relevant for this question? (2 points)
- 2.Who issues the permit for this work? Is this a local or state agency? (3 points) What section/sections in the ROW manual for the city of Burleson, Texas are relevant for this question? (2 points)
- 3.Must we submit construction plans to the city? If so, how many and to what entity are they submitted? (3 points) What section/sections in the ROW manual for the city of Burleson, Texas are relevant for this question? (2 points)
- 4.Once the permit is issued, how long must we wait before commencing work? How long do you have MAXIMUM to start work? (3 points)
What section/sections in the ROW manual for the city of Burleson, Texas are relevant for this question? (2 points)
- 5.How deep must any cables be buried? (3 points)
What section/sections in the ROW manual for the city of Burleson, Texas are relevant for this question? (2 points)
- 6.What are the exact detailed compaction requirements as listed in the manual provided by the city for restoration of any surface that is trenched? When do compaction of trenches have to occur? What are the backfill to be made of? (3 points)
What section/sections in the ROW manual for the city of Burleson, Texas are relevant for this question? (2 points)
- 7.Is the company we hire to do the work required to be registered in any way? If so, what registrations or certifications are accepted? (3 points)
What section/sections in the ROW manual for the city of Burleson, Texas are relevant for this question? (2 points)
- 8.When is interference with traffic flow allowed? (3 points)
What section/sections in the ROW manual for the city of Burleson, Texas are relevant for this question? (2 points)
- 9.During what hours may work not be done? (3 points)
What section/sections in the ROW manual for the city of Burleson, Texas are relevant for this question? (2 points)
Section III: Look at the “Best Practices for Preparing a RFP” document available in doc sharing or from the Week 4 ilab page and answer the questions below. (This document was created by Faulkner Information Services and downloaded from the DeVry library database.)
- 1.This document is a tutorial prepared to help IT professionals work on RFPs if they have not worked with them in the past.Write a paragraph of at least 10 sentences that outline what you learned when reading this document that you did not know and you will need to consider when writing your RFP? (5 points)
- 2.What in your mind are some of the reasons RFPs are successful and some reasons they fail? (2 points)
- 3.Would you consider using online or automated RFP development tools from an outside vendor? Why or why not? (2 points)
- 4.How will you work to set up the hardware and software requirement portions of an RFP? (2 points)
- 5.When considering Business needs and project domain, were there surprises in this document that you were not aware had to be addressed in a successful RFP? (2 points)
- 6.How will you work to determine a short list of suppliers for your RFP? (2 points)
Section IV: Using the RFI template available in doc sharing and from the Week 4 iLab page, answer the questions below.
- 1.Look at the template provided as an example by Sourcing for OEM
.sourcing4oem.com/”>www.sourcing4oem.com that is available in doc sharing. How would using a template as a start to creating an RFP or RFI help you with this job? (2 points)
- 2.Can you create a complete RFP or RFI without investigating the business or technical requirements for the project? How will you use the vendors expertise to help you create a complete and on-time and on-budget project installation? (2 points)
- 3.What do you think about vendors helping create the RFP and RFI especially if you are working with a company that has a small IT staff or does not have anyone with the expertise to work on a new technology? (2 points)
- 4.Is this process more complicated that you thought it would be? (2 points)
.equella.ecollege.com/file/eca204c4-04cd-45e6-8940-5afb2a2733ae/18/NETW310_W4_iLab.html#top”>
.equella.ecollege.com/file/0a3d73e8-5c8e-48e5-be27-38212d6d4a2b/15/NETW310_W3_iLab.html#top”>
DeVry Courses helps in providing the best essay writing service. If you need 100% original papers for DeVry NETW 310 Week 4 iLab Latest, then contact us through call or live chat.
DeVry NETW 310 Week 4 iLab Latest

Reviews
There are no reviews yet.